How long does cabinet refinishing take for a Windermere executive kitchen?

Windermere executive kitchen cabinet refinishing typically takes 10 to 14 business days from door removal to final reinstallation. That is slightly longer than the 7-to-10-day timeline for a standard Edmonton kitchen because Windermere kitchens have significantly more cabinet surface area, commonly 35 to 60+ doors and drawer fronts when you include the main kitchen, islands, butler's pantries, and walk-in pantry cabinetry.

Why the Timeline Is Longer in Windermere

  • Higher door counts: A typical Windermere home has 35 to 60+ doors versus the 20 to 35 doors in a standard Edmonton kitchen.
  • Butler's pantries and walk-in pantries: These secondary cabinet areas often match the main kitchen finish and add 20 to 30 percent more surface area.
  • Oversized islands: Many Windermere islands measure 10 to 14 feet with cabinetry on all four sides.
  • Detailed mouldings and end panels: Executive-grade cabinetry often has crown mouldings, applied end panels, and decorative posts that require additional spray passes.

Typical Windermere Project Schedule

  • Days 1 to 2: Removal, labelling, transport to spray booth. Boxes masked in place.
  • Days 3 to 5: Stripping, sanding, grain filling (critical for oak and oak-veneered pieces).
  • Day 6: Bonding primer on all pieces.
  • Days 7 to 10: Multiple spray coats with full cure time between. Executive kitchens often require three topcoats versus two for standard builds.
  • Days 11 to 12: Clear coat if specified, quality inspection, hardware installation.
  • Days 13 to 14: Doors and drawers reinstalled, adjustments, walk-through, warranty activation.

Your Kitchen Stays Mostly Usable

Because doors and drawers are finished in our spray booth, the kitchen boxes stay in place and most Windermere families continue cooking and using the kitchen throughout the project. Families with kids at Dr. Donald R. Massey School or Constable Daniel Woodall School appreciate that morning and after-school routines keep moving. The main disruption is the 6-to-8-hour window when boxes are being spray-primed and top-coated in place.

Book a free on-site consultation and we will build a day-by-day schedule for your specific Windermere kitchen.

Executive Kitchen Timelines in Windermere

Timeline reality in Windermere comes down to geography and build era. Homes west of Rabbit Hill Road, those backing onto the Windermere Waters ravine system, and properties near the Windermere Golf & Country Club all tend to sit on the larger end of the executive housing stock. That is where we see the 55 to 60+ door projects that push toward 14 business days. Smaller semi-executive homes closer to the Currents of Windermere retail district or near the Windermere Cineplex often wrap in 10 or 11 days. Access in and out via Anthony Henday Drive is fast, which is helpful because we typically transport doors to and from our spray booth twice during a project. Coverage details are on our Windermere service area page.

Homes built between 2005 and 2015 by Cambrian, Morrison Homes, Brookfield Residential, Jayman MasterBUILT, or Sterling Homes share predictable construction details: applied end panels, furniture-grade islands, crown moulding stacks, and paneled appliance garages. Those features add spray passes and cure time, which is why Windermere executive kitchens run a few days longer than a comparable project in an older Edmonton neighbourhood. Butler's pantries and walk-in pantries feeding off Windermere Boulevard kitchens almost always match the main kitchen finish, so we schedule them into the same spray runs to stay efficient.

Have More Questions?