How Long Does Cabinet Refacing Take in Sherwood Park?
A typical 20 to 30 door kitchen refacing in Sherwood Park takes 7 to 10 working days from old door removal to final installation. Smaller kitchens with 10 to 20 doors finish in 5 to 7 days. Larger executive kitchens with 40+ doors and island cabinetry stretch to 10 to 14 days. Your kitchen stays partially functional throughout most of the process because refacing does not require plumbing disconnects, countertop removal, or demolition. Our crew reaches Sherwood Park from our south Edmonton shop in about 20 minutes via Anthony Henday Drive, which lets us work multiple days each week in Strathcona County without travel delays eating into your project schedule.
Timeline by Kitchen Size and Neighbourhood
Most Sherwood Park refacing projects fall into three size brackets. Standard builder-grade kitchens in Nottingham, Mills Haven, and Foxboro typically have 20 to 30 doors and drawer fronts and finish in the 7 to 10 day range. These homes were built during Sherwood Park's rapid expansion along Baseline Road and Sherwood Drive in the late 1980s and 1990s, and their layouts are predictable enough that we can pre-cut most materials before arriving on site.
Smaller kitchens in Brentwood or the original core near Sherwood Park Mall run 5 to 7 days. Executive properties in Broadmoor Estates, Emerald Hills, and Lakeland Ridge often have 40 to 60 doors, island cabinetry, butler pantries, and built-in hutches that push timelines to 10 to 14 days. Door count is the single biggest schedule driver, followed by hardware swap complexity and whether crown moulding or light rail additions are included.
What Happens Each Day
Day one covers door and drawer front removal, hardware documentation, and box preparation. Days two through five cover face frame veneering, end panel installation, and primer or finish work on the boxes. Days six through nine cover door installation, drawer front alignment, soft-close hinge adjustments, and hardware installation. The final day is punch list walk-through, touch-ups, and final cleaning. You keep access to your sink, stove, and refrigerator for most of the project because we work in zones rather than gutting the whole kitchen at once.
Factors that can extend a Sherwood Park timeline include hardware upgrades from knobs to cup pulls (requires drilling and filling of old holes), crown moulding or light rail additions, and tall upper cabinet extensions to the ceiling. Weather plays a role during winter months because exterior air-drying of finish coats is not an option, so we rely on our temperature-controlled shop near the Yellowhead Highway 16 corridor to maintain consistent cure times year-round.
Cabinet Refacing Timelines in Sherwood Park
Strathcona County's layout makes scheduling predictable for our crew. From our Edmonton shop, we reach Sherwood Park service area neighbourhoods like Summerwood, Mills Haven, and Broadmoor Estates in 20 minutes via Anthony Henday Drive and Yellowhead Highway 16. Baseline Road and Wye Road form the main east-west corridors, while Sherwood Drive connects south to Millennium Place and north toward Festival Place. We schedule multiple projects per week across Nottingham, Foxboro, Emerald Hills, and Lakeland Ridge, which means reduced travel overhead and tighter day-to-day progress on your kitchen.
Sherwood Park is an unincorporated urban service area within Strathcona County, and its housing stock ranges from early 1980s builds near Broadmoor Public Golf Course to newer executive developments by the Strathcona Wilderness Centre. Older homes sometimes have non-standard cabinet openings that require custom-measured doors, adding a day or two. Newer executive homes typically have larger door counts and more complex island designs, which is why we always book an in-home consultation before quoting a firm timeline for your specific kitchen.
Have More Questions?
Get answers from Edmonton's trusted painting contractor. 15 years experience, 156 five-star reviews, and a 5-year written warranty.
Get Free Estimate